Óleo de Athabasca – 2019 Almofadas Multi-Poços

Gas Liquids Engineering Ltd. (GLE) completed EPCM services for the detailed design of a greenfield quad oil pad for Athabasca Oil Corporation. The new pad site was designed to accommodate a six (6) well expansion on the pad. Startup date was March 2020. Initially installed equipment included:

  • Four (4) Wellheads
    • 2 MMSCF/d Gas Volume Each
    • 400 bbl/day Oil Volume Each
    • 400 bbl/day Water Volume Each
  • One (1) Quad Separator Package
  • One (1) Remote Terminal Unit (RTU) Panel
  • One (1) 1000 Gallon Methanol Tank
  • One (1) 1000 Gallon Paraffin Inhibitor Tank
  • One (1) 500 Gallon Corrosion Inhibitor Tank
  • One (1) Thermoelectric Generator (TEG)
  • One (1) 8” CL600 Low Pressure (LP) Pig Launcher
  • One (1) 6” CL600 High Pressure (HP) Pig Launcher
  • One (1) 3” CL600 Fuel Gas Pipeline
  • One (1) 4” CL1500 Lift Gas Pipeline