Yangarra Resources – Pipeline & Well Tie-In 5-20

Gas Liquids Engineering Ltd. (GLE) completed EPCM services for the tie-in of a well, and the installation of a new pipeline. Project scope included:

  • One (1) Inlet Separator
  • One (1) 100 bbl Produced Water Tank
  • Two (2) 200 bbl Condensate Tanks
  • Wellhead
  • Pipeline with Pig Sender / Receiver
    • 220 metre long pipeline, 88.9 mm (3 NPS) outside diameter, CSA Z245.1, Grade 3592

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy