Gas Liquids Engineering Ltd. (GLE) completed EPCM services for the detailed design of the 4 MMSCF/d Pine Creek sweet gas plant for Talisman. Installed equipment includes:

  • Wellhead
  • Sand Separator with Bypass
  • Three-phase Inlet Separator with Gas, Condensate & Water Metering with Allowance for Condensate Blow
  • Case & Methanol Injection
  • Two (2) 400 bbl Water Storage Tanks
  • One (1) 50 bbl Pop Tank
  • RTU Panel
  • Diesel Generator for Heat Tracing
  • Remote Wireless Transmitters
  • Designed for future HP & LP Dual Flare Stack with FKOD
  • Connections for Future P-Tank Tie-In for Flow Back

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy