Suncor – Rosevear

Gas Liquids Engineering Ltd. (GLE) provided preliminary and detailed engineering, procurement and construction of a 5 MMSCF/d acid gas (50% H2S) injection facility requiring two 600 kW (800 hp) variable speed electric drive compressors, acid gas chilling, associated pipelines and the addition of an auxiliary steam boiler and Sour Water Flash Tank. GLE was responsible for regulatory, project management, construction management, commissioning, and operations support, as well as installation of a 2nd stabilizer and associated equipment from the North Rosevear facility.