Detailed design work and installation of a 8.3 km long 6 NPS gathering pipeline to connect wellsite d-60-J to dehydration facility b-7-k. Pipeline was designed for 30% H2S.

  • 8.3 km (5.2 mile) long pipeline, 168.3 mm (6 NPS) outside diameter, 2” insulation (1” at crossing bores), CSA Z662 with HIC resistant select chemistry carbon steel ERW
  • Maximum Operating Pressure (MOP) of 12,400 kPag (1800 psig)
  • 2 major river bores (Horizontal Direction Drill of Wapiti River and unnamed tributary to Red Deer Creek)

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy