Suncor – Ojay Pipeline

Detailed design work and installation of a 8.3 km long 6 NPS gathering pipeline to connect wellsite d-60-J to dehydration facility b-7-k. Pipeline was designed for 30% H2S.

  • 8.3 km (5.2 mile) long pipeline, 168.3 mm (6 NPS) outside diameter, 2” insulation (1” at crossing bores), CSA Z662 with HIC resistant select chemistry carbon steel ERW
  • Maximum Operating Pressure (MOP) of 12,400 kPag (1800 psig)
  • 2 major river bores (Horizontal Direction Drill of Wapiti River and unnamed tributary to Red Deer Creek)