SemCAMS – Kaybob Amalgamated AGI

Gas Liquids Engineering Ltd. (GLE) provided design, engineering, procurement and construction support for a new acid gas injection system at the SemCAMS KA facility. These dual acid gas compressors are designed to inject a total of 3.36 MMSCF/d of acid gas at the Kaybob Amalgamated facility located south of Fox Creek, Alberta. Highlights of the project are:

  • Two (2) Ariel JGJ/6-6 L2C 1.68 MMSCF/d, 5-stage acid gas injection compressors driven by 700hp Hyundai EMD motors
    • 2×50% design
    • No dehydration
  • Full stainless steel design compressor and associated coolers, piping and valving. Designed for 30-60% H2S.
  • Drilling of acid gas injection well (by others)
  • Blowdown lineheater configuration
  • Methanol injection system
  • Modular Pipe Racks with piping installed prior to shipment to site
  • Prefabricated Buildings
    • Two (2) Compressor Buildings
    • One (1) Electrical Building
  • LED Lighting
  • Site grading and preparation, including pre-drilling and installation of steel driven piles
  • Full in-house EI&C Engineering

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy