Rio Alta Exploration Ltd. – Galloway Gas Processing Facility Expansion

Gas Liquids Engineering Ltd. (GLE) provided complete EPCM services for a 75 MMSCF/d sweet gas expansion to an existing 20 MMSCF/d sour gas facility. Project scope included:

  • Two (2) 110,000 gallon LPG bullets
  • Inlet Compression
  • Designed for 3 x 3300 hp. 2 x 3300 hp installed, with additional 3300 hp installed in a later year
  • Large Inlet slug catcher
  • Stabilization System
  • Compression Refrigeration plant
  • Flare system

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy