Red Mountain Energy – Minnibai Cryogenic Facility

Gas Liquids Engineering Ltd. (GLE) completed process design, basic, and FEED engineering for a 45 MMSCF/d cryogenic facility to separate nitrogen, sales gas, and C2+ products from a mixed stream of these components. The plant embodies a relatively simple two (2) tower design, without the need of external refrigeration, with effective nitrogen rejection, high purity sales gas, and 95-99% recovery of ethane in the C2+ stream. Installed equipment included:

  • Sales Gas Compression: Two (2) 3000 kW (6 kV, 50 Hz) Cameron Superior WH75 3-stage, 6-throw reciprocating compressors
  • C2+ Compression and liquefaction: Two (2) 600 kW (6 kV, 50 Hz) Cameron Superior RAM 54 three-stage four-throw reciprocating compressors
  • 6 MW Total plant design capacity supplied at 6000 V / 400 V / 220 V @ 50 Hz
  • New control room, MCC building, compressor building, instrument air / ventilation building, and turboexpander building. All buildings were constructed on site instead of shop built.

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy