Plains Midstream – Gull Lake LACT & MCC Replacement

Gas Liquids Engineering Ltd. (GLE) completed EPCM services for Plains Midstream to install a new LACT & MCC building at their 13-35 facility. The project was partially completed in 2013 by GLE before being put on hold. The project was restarted and completed in 2019.

2013 Project Scope:

  • Installation of LACT and MCC
  • Wiring from MCC to LACT
  • Pipeline ROW determined and alignments sheets created, but land was not acquired at the time
  • Two (2) Pig Sender / Receivers constructed but not installed at the time

2019 Project Scope:

  • Installation of new HVAC unit in MCC
  • Installation of Sump Tank and Drains
  • New PSV’s and Valves
  • Installation of new instrumentation and piping
  • Installation of 120VAC UPS inside MCC building
  • Review BS&W Monitor Installation and Terminate Wires
  • Replace existing sampler & spool with Clif Mock sampler and pull new cables/terminate
  • Inspect motor and pump
  • Inspect PD meter
  • Acquire land and construct 460 metre pipeline lateral
  • Installation of two previously constructed Pig Sender / Receiver units
  • Full in-house EI&C Engineering

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy