Pengrowth Energy – Westward Ho Battery Upgrade

Gas Liquids Engineering Ltd. (GLE) provided complete EPCM services for the expansion of Pengrowth Energy’s Westward Ho Oil Battery. The 2013 drilling program brought on an additional 7 MMSCF/d of gas production which required the installation of a new inlet separator and compressor. Installed equipment included:

  • One (1) Ariel JGD4 compressor package equipped with a 1680 hp Waukesha 7044GSI Natural Gas Engine c/w cooler
  • Inlet Separator
  • 18” Stainless Steel Air Elimination Vessel
  • 100 bbl Pop Tank
  • TCI 2000 Incinerator c/w 3” Inlet
  • Existing Dehydrator Modifications

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy