Gas Liquids Engineering Ltd. (GLE) was responsible for the engineering and project management of a replacement of an existing auxiliary boiler at the HR Milner coal fired power plant with a replacement boiler from Pawtucket Rhode Island. Design of the facility is based on the existing boiler installation with adjustments to the piping and structural to suit the differences between the existing and replacement boilers.