Iteration Energy – North Boundary B10-32-87-W6M Gas Battery & Pipeline

Gas Liquids Engineering Ltd. (GLE) provided complete EPCM solutions for the installation of a gas battery and pipeline at Iteration Energy’s North Boundary B10-32-087-18-W6M wellsite. Installed equipment included:

  • Two (2) RJV 8” Lo-Flo Separator Packages
  • 2386 metre long pipeline, 114.3 mm (4 NPS) outside diameter, Grade 359 Cat 2 YJ-1

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy