Iteration Energy – North Boundary 15-31-88-14 W6M Gas Battery & Pipeline

Gas Liquids Engineering Ltd. (GLE) provided complete EPCM services for the installation of a gas battery and pipeline for Iteration Energy’s North Boundary 15-31-88-14-W6M wellsite. Installed equipment included:

  • Two (2) RJV 8” Lo-Flo Separator Packages
  • 697 metre long pipeline, 114.3 mm (4 NPS) outside diameter, Grade 359 Cat 2 YJ-1
  • Tie into separator discharge at 11-31-88-14-W6M

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy