Iteration Energy – Kaybob 06-20-65-20-W5M Tie-In

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the installation of a gas battery at Iteration Energy’s 06‑20‑65‑20-W6M wellsite. Installed equipment included:

  • One (1) 16” Separator c/w 100 bbl Tank
  • One (10 400 bbl Liquids Production Tank
  • Well Tie-In Pipeline, 88.9 mm (NPS 3) outside diameter

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy