Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the installation of a gas battery at Iteration Energy’s 06‑20‑65‑20-W6M wellsite. Installed equipment included:
- One (1) 16” Separator c/w 100 bbl Tank
- One (10 400 bbl Liquids Production Tank
- Well Tie-In Pipeline, 88.9 mm (NPS 3) outside diameter