Gas Liquids Engineering Ltd. (GLE) provided EPCM services to install a gas battery at Iteration Energy’s Birley Umbach c-61-L / 94-H-3 wellsite facility. Installed equipment included:
- Two (2) RJV 8” Lo-Flo Separator Packages
- 2765 metre long pipeline, 114.3 mm (4 NPS) outside diameter, Grade 359 Cat 2 YJ-1