IPC – Suffield Alderson GU3 Consolidation & Sales Gas Pipeline

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the Gas Unit 3 (GU3) consolidation and a new Sales Gas Pipeline installation. Project scope included:

  • New 2310 meter long Sales Gas Pipeline, 168.3 mm (6 NPS) outside diameter, CSA Z245.1, Grade 359 from 12‑16-14-08-W4M to 09‑20‑14‑08‑W4M c/w Metering Station modifications
  • GU3 Consolidation
    • Compressor K-101 and Dehydrators Decommissioned
    • Tie Compressor K-501 Discharge into existing IPC Pipeline with allowance to bypass K-501 if it is determined to be uneconomical to run
    • Convert GU3 Fuel Gas Heaters to Electric Heaters

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy