IPC – Suffield Alderson Compressor Station Booster Addition

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the installation of a Booster Compressor at the Alderson Compressor Station for IPC Canada.

The used 530 hp compressor package equipped with a Frick 355XL screw compressor and driven by a Waukesha H24GL engine was installed upstream of the existing K-400 and K-401 sales compressors in a newly fabricated building on top of an existing gravel pad.

As part of the project an existing Inlet Building (BU-200) and Filter Separator Building (BU-300) were also decommission. K-400 was kept in operation for the first month following the installation of the booster compressor, but was also disconnected and decommissioned afterwards.

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy