Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the installation of a Booster Compressor at the Alderson Compressor Station for IPC Canada.
The used 530 hp compressor package equipped with a Frick 355XL screw compressor and driven by a Waukesha H24GL engine was installed upstream of the existing K-400 and K-401 sales compressors in a newly fabricated building on top of an existing gravel pad.
As part of the project an existing Inlet Building (BU-200) and Filter Separator Building (BU-300) were also decommission. K-400 was kept in operation for the first month following the installation of the booster compressor, but was also disconnected and decommissioned afterwards.