Husky Energy – Wembley Multi-Well Pad

Gas Liquids Engineering Ltd. (GLE) is currently undertaking EPCM services for Husky Energy to construct a multi-well gas battery in the Wembley area. The facility is located 55 km Northwest of Grand Prairie, Alberta.

The pad is designed to be executed in multiple phases, with Phase 1 including the installation of 3 of the 12 proposed wells to be installed on the lease.

Installed equipment will include:

  • Three (3) New Wells; each c/w
  • Wellhead ESDV
  • Sand Separator
  • Inlet Control Valve (Angle Choke)
  • Triple Separator Package
  • Three (3) 3-Phase Separators
  • One (1) Instrument Air Compressor
  • Ten (10) Injection Pumps
  • One (1) RTU Panel
  • Chemical Tank Skid
  • Two (2) produced water storage vessels
  • HP Flare Knock Out Drum
  • Dual HP Flare stack
  • Communication Tower / Radio Mast (TBD with Path Study)

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy