Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the replacement of an existing 3500 hp gas re-injection compressor at Husky Energy’s A-Pool site with a new 1200 hp electric drive compressor. The existing compressor suffered a compressor and motor failure after a lube oil system failed. The project involved the installation of:

  • One (1) 1200 hp 4160 V 3-phase @ 60hz electric drive Ariel JGH-4 2-stage reciprocating compressor c/w local PLC, associated switchgear and soft start for motor
  • Liquids pump skid to remove condensed hydrocarbons and water from existing 3-phase separator
  • 10” Flare Stack c/w 24 V DC igniter panel
  • Two (2) Instrument Air Compressors
  • 300# ANSI PSV for existing inlet separator
  • New SCADA system
  • New 4160 VAC Supply Lines & Transformer
  • 480 V MCC Cabinet, 120 V AC Transformer, 120 V DC and 12 V DC UPS System

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy