Husky Energy – North Blackstone 14-35 Compressor

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for Husky Energy to install a new compressor at Husky Energy’s North Blackstone 9-9 Compressor Station.

The new compressor is utilized to reduce wellhead pressure on the 14-35 wellhead to increase well production rates. The compressed gas is directed back into an existing 8” pipeline to the 9-9 Compressor Station facility. Over time gas production will reduce from 8.6 MMSCF/d to approximately 3.3 MMSCF/d.

Project scope included the installation of:

  • One (1) two-stage Ariel JGK-2 compressor package equipped with 810 hp Caterpillar 3512TALE natural gas engine c/w local PLC
  • One (1) 42” x 5.5’ Stainless Steel 2-Phase Inlet Separator
  • ESD Valves for Compressor Inlet, Discharge and Fuel Gas
  • Waste Oil Tank c/w Secondary Containment
  • Barrel Dock c/w Secondary Containment

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy