Husky Energy – Ansell Gas Plant Glycol Surge Drum Replacement

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the replacement of a glycol surge drum at Husky Energy’s Ansell Gas Plant.

The existing vessel was the shell side of an old Utility Glycol Heater that was built in 1972. It had reached its life expectancy and was no longer safe to be kept in service. Project scope included:

  • Removal of 1972 Glycol Surge Drum
  • Removal of old fuel gas lines
  • Removal of Glycol Storage Tank & Glycol Pop Tank
  • Install new 1.5 m x 8.7 m Stainless Steel Glycol Surge Drum on existing piles and support and re-use existing piping where possible

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy