Enerplus – Virden Routledge 16-17 Battery Upgrades

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for modification at Enerplus’ Virden Routledge oil battery to fix an oxidized flare stack and reduce site emissions. Project scope included:

  • Removal of existing Flare Stack and associated piping
  • Installation of 40’ Dual HP / LP Flare Stack and associated piping
  • Tie-in low pressure tank vents into flare
  • Installation of a blanket gas system for existing tanks

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy