Gas Liquids Engineering Ltd. (GLE) provided EPCM services for modification at Enerplus’ Virden Routledge oil battery to fix an oxidized flare stack and reduce site emissions. Project scope included:
- Removal of existing Flare Stack and associated piping
- Installation of 40’ Dual HP / LP Flare Stack and associated piping
- Tie-in low pressure tank vents into flare
- Installation of a blanket gas system for existing tanks