Enerplus – Neptune Battery Conversion to Satellite

Gas Liquids Engineering Ltd. (GLE) provided EPCM services to convert an oil battery located at 05-30 into a test satellite, and tie-in to the nearby 05-31 oil battery. Project scope included:

  • Replace separator vessel and associated piping which are limiting production pressure
  • Replace portions of existing inlet and test header
  • Add bypass ESDV around separator
  • Replace sour instrument gas with instrument air
  • Remove piping as necessary to take the treating equipment out of use
  • Add Pig launcher on outgoing Emulsion Line
  • Installation of a new pop tank
  • Piling and structural steel for new piping
  • Demolition of existing unsalvageable equipment on site, mothballing Water Pump and Treater, and site clean-up

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy