Gas Liquids Engineering Ltd. (GLE) provided EPCM services to convert an oil battery located at 05-30 into a test satellite, and tie-in to the nearby 05-31 oil battery. Project scope included:
- Replace separator vessel and associated piping which are limiting production pressure
- Replace portions of existing inlet and test header
- Add bypass ESDV around separator
- Replace sour instrument gas with instrument air
- Remove piping as necessary to take the treating equipment out of use
- Add Pig launcher on outgoing Emulsion Line
- Installation of a new pop tank
- Piling and structural steel for new piping
- Demolition of existing unsalvageable equipment on site, mothballing Water Pump and Treater, and site clean-up