Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the reconfiguration of 12 wells in the Medicine Hat Glauc C area. Project scope included:
- Installation of a coriolis meter at each wellhead
- Installation of an auto-sampling device at each wellhead enclosed in a heated utilidor
- Replacement of existing threaded piping with welded piping
- Replacement of existing 2” steel lines from wellheads to flex-pipe
- Modifications to header piping at the satellite facilities
- Installation of a new 8” steel pipeline to transfer the combined production to nearby oil battery