Enerplus – Medicine Hat Glauc C Section 4 Wellhead Modifications

Gas Liquids Engineering Ltd. (GLE) provided EPCM services to reconfigure twelve (12) wells in the Medicine Hat Glauc C Section 4 area to replace the use of satellite skids to solve some operational and regulatory issues.

A Coriolis meter was installed at each wellhead to monitor production and control the downhole pump via a pump-off controller. Connections were left for future auto-samplers which will be enclosed in a heated utilidor. Sampling rates are controlled and adjusted by a PLC panel c/w HMI. Temperature and pressure transmitters were also installed to be ready for SCADA to be installed at a later date.

Some existing steel pipelines were replaced with 301 series flexpipe as part of the project scope as well. An existing 4” 301 flexpipe from 02-04 to 13-34 satellite was also replaced with a new 8” steel pipeline to handle a larger production capacity.

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy