Enerplus – Medicine Hat Glauc C 2-16 Satellite

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the installation of a new satellite for Enerplus in the Medicine Hat area.

Three (3) new wells were drilled in the area, which already had five (5) existing producers. The resulting ~500 m³/d of oil emulsion required the installation of the new satellite, which was designed to handle twelve (12) wells.

Installed equipment included:

  • 30” x 10’ Vertical Test Separator Building c/w 6” Group Header, 4” Test Header, ESD Bypass System and Instrument Air Package
  • MCC Building
  • One (1) 100 bbl Pop Tank
  • 8” Pig Launcher
  • Associated Piping

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy