Enerplus – Kingsford 10-22-4-7-W2M Oil Battery

Gas Liquids Engineering Ltd. (GLE) provided EPCM services to upgrade Enerplus’ Kingsford 10-22-4-7-W2M Oil Battery to increase production rates. The oil battery was handling 274m³/d of emulsion (240 m³/d Water and 34 m³/d Oil). After the upgrades the facility will be able to handles roughly 1800 m³/d of emulsion. Project scope included the installation of:

  • One (1) 6’ x 25’ FWKO
  • Two (2) 1000 bbl Water Tanks (Disposal, Settling)
  • One (1) Water Injection Skid
  • One (1) Instrument Air Package
  • One (1) Flare Stack c/w Auto Ignition
  • One (1) MCC Building
  • One (1) Office / Control Room
  • VRU Control System
  • Relocate existing 300 bbl Pop Tank
  • Removal of two (2) existing 400 bbl Water Tanks

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy