Enerplus – Giltedge 4 Well Water Injection Tie-In

Gas Liquids Engineering Ltd. (GLE) provided EPCM services to tie-in four newly converted water injection wells in the Giltedge area to expand Enerplus’ injection capacity. Project scope included:

  • Tie-in 6-24 to 103/04-24 with 250 m of 2” Fiberspar Pipe
  • Tie-in 12-23 to 102/14-23 with 550 m of Centron SP 1500 Fiberglass Line Pipe
  • Tie in 04-23 to 14C-14 with 500 m of Centron SP 1500 Fiberglass Line Pipe
  • Tie in 09-25 to 10D-25 with 50 m of Centron SP 1500 Fiberglass Line Pipe
  • Two Battle River Crossings
    • One (1) 6” Centron SP 800 Fiberglass Line to replace existing 6” Oil Line c/w Pig Launcher / Receiver
    • One (1) 3” HDPE line to replace two (2) existing 2” Gas Lines c/w Pig Launcher / Receiver

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy