Enerplus – Giltedge 4 Well Water Injection Tie-In

Gas Liquids Engineering Ltd. (GLE) provided EPCM services to tie-in four newly converted water injection wells in the Giltedge area to expand Enerplus’ injection capacity. Project scope included:

  • Tie-in 6-24 to 103/04-24 with 250 m of 2” Fiberspar Pipe
  • Tie-in 12-23 to 102/14-23 with 550 m of Centron SP 1500 Fiberglass Line Pipe
  • Tie in 04-23 to 14C-14 with 500 m of Centron SP 1500 Fiberglass Line Pipe
  • Tie in 09-25 to 10D-25 with 50 m of Centron SP 1500 Fiberglass Line Pipe
  • Two Battle River Crossings
    • One (1) 6” Centron SP 800 Fiberglass Line to replace existing 6” Oil Line c/w Pig Launcher / Receiver
    • One (1) 3” HDPE line to replace two (2) existing 2” Gas Lines c/w Pig Launcher / Receiver