Enerplus – Oil Bantry

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for a new oil battery to handle production of 6700 m³/d of emulsion consisting of 6100m³/d of water, 600m³/d of oil, and 15 MMSCF/d of associated gas from numerous wells in the Bantry region. The oil battery treats oil and gas to pipeline specification and disposes of produced water. Project scope included:

  • 6700 m³/d total emulsion liquid and associated gas inlet rate
    • 600 m³/d inlet oil rate
    • 6100 m³/d inlet water rate
    • 15 MMSCF/d inlet gas rate
  • Fire Water Knock-Out (FWKO) Drum
  • One (1) 10′ x 40’ long Treater with two (2) 24” firetubes rated at 3.2 MMBtu/hr
  • Water Injection Pumps
    • Upgrade a repurposed 1000 hp Bingham centrifugal water injection pump from an existing interpipe facility with a new 1000 hp VFD to replace existing 700 hp VFD
    • New 1000 hp Bingham centrifugal water injection pump and new VFD
  • Two (2) 1250 hp Waukesaw driven, Ariel 4-throw 3-stage compressors
  • Single stage VRU
  • Pipelines
  • Metering
  • Flare
  • 1.25 MMBtu/h heat medium
  • Storage tanks
    • Two (2) 5000 bbl water tanks
    • One (1) 2500 bbl sales oil tank
    • One (1) 2500 bbl production oil tank
    • One (1) 2500 bbl slop / divert / truck tank

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy