Gas Liquids Engineering Ltd. (GLE) provided EPCM services for Enerplus to construct a pilot scale polymer injection facility as part of Enerplus’ enhance oil recovery (EOR) program for their Medicine Hat Glauc C field. Project scope included:
- Five (5) 200m³/d Injection Wells @ 1300 ppm, 13 MPa
- One (1) 1000 bbl Water Storage Tank
- Polymer Injection Package
- One (1) 185 gpm Grunfos 20 hp Water Booster Pump
- One (1) 1 gph Milton Roy 1 hp Oxygen Scavenger Pump
- One (1) 20 hp SNF 20hp Polymer Slicing Unit
- Three (3) 800 US Gallon Mixing Tanks
- One (1) 900 US Gallon Application Tank
- Four (4) 2 hp Chemineer Agitators
- Two (2) 80 gpm Boerger 10 hp Polymer Metering Pumps
- One (1) 3 gpm Moyno 1 hp Surfactant Metering Pump
- Three (3) 92 gpm National Oilwell 125 hp Polymer / Water Injection Pumps
- One (1) 15 hp Kaeser Instrument Air Package
- Two (2) Parker Post Dilution Filtration Canisters
- Two (2) Parker Water Filtration Canisters
- 100 Tonne Polymer Storage Silo
- 50 bbl Water Storage Tank
- Emergency Shower Building
- Sample Analysis / Lab Building
- MCC Building