Enermark – Neptune

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for multiple upgrades at Enermark’s Neptune oil battery.

Phase 1 included the installation of a new water disposal pump, and additional water storage tanks to increase the water clean-up, storage, and disposal capabilities.

Phase 2 included modifications to allow an increase in oil treating capabilities, increased oil storage volumes, and larges gas handling systems.

The facility originally was able to handle 167 m³/d of Total Inlet Emulsion (140 m³/d Produced Water, 27 m³/d Produced Oil). After the modifications were completed it allowed for 665 m³/d of Total Inlet Emulsion (535 m³/d Produced Water, 130 m³/d Produced Oil)

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy