Enermark – Fox Valley

Gas Liquids Engineering Ltd. (GLE) was responsible for project coordination for the design, construction, and installation of one (1) Ariel JGK/4 frame, a Caterpillar G3512-LE natural gas driver, and the removal of two (2) existing compressors from the site. GLE was responsible for:

  • The design layouts and site configuration
  • The completion of project cost estimates
  • Completed equipment bid, evaluations and award
  • The sizing and design of all required equipment
  • Coordination of drawing completion with drafting department
  • Coordination with Tarpon Energy Services for the electrical design and construction
  • Coordination and shipping of all equipment to site
  • Provision of field support during construction

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy