Gas Liquids Engineering Ltd. (GLE) was responsible for project coordination for the design, construction, and installation of one (1) Ariel JGK/4 frame, a Caterpillar G3512-LE natural gas driver, and the removal of two (2) existing compressors from the site. GLE was responsible for:

  • The design layouts and site configuration
  • The completion of project cost estimates
  • Completed equipment bid, evaluations and award
  • The sizing and design of all required equipment
  • Coordination of drawing completion with drafting department
  • Coordination with Tarpon Energy Services for the electrical design and construction
  • Coordination and shipping of all equipment to site
  • Provision of field support during construction