Gas Liquids Engineering Ltd. (GLE) is currently providing EPCM services for construction of an acid gas compressor, acid gas pipeline, and acid gas injection well for Encana at their Pipestone Processing Facility (PPF) located Northwest of Grande Prairie. Project scope includes:
- Three (3) 8.42 km Acid Gas Pipelines: 88.9 mm (3.5 NPS) outside diameter, maximum operating pressure 8000 kPag (1160 psig), CSA Z245.1, Grade 359, Category II, Sour, Hydrogen Induced Crack (HIC) Resistant Lines. Pipelines will be installed in a common Right-of-way (RoW).
- 2 x 50% 300 hp 600V Positive Displacement Diaphragm Injection Pumps rated at 5315 kPag (770 psig) suction pressure and 21000 kPag (3046 psig) discharge pressure
- Flare System & Knock-out Drum
- Fuel Gas System
- Dilution Gas System
- Injection Well
- Site civil design and work including grading plans
- Full in-house EI&C engineering
- LED Lighting