Gas Liquids Engineering Ltd. (GLE) provided full EPCM services for the construction of a 42 MMSCF/d sour gas plant that is capable of treating wet and sour flow streams. The pipeline system gathers production from thirteen wellsites. Installed equipment included:
- 3-phase horizontal inlet separator designed to handle 2500 ppm sour natural gas
- 45 US gpm Amine Sweetening
- Four (4) Ariel JGK/4 compressor packages equipped with 1500 hp Waukesha 7042GSI natural gas engines
- One (1) 400 hp Electric Refrigeration Compressor
- One (1) 200 hp Electric Recycle Compressor
- One (1) 50 hp Electric Acid Gas Compressor
- Two (2) Rotary Vane Instrument Air Compressors
- 9.0 MMBtu/hr Heat Medium
- Two (2) 400 bbl condensate storage tanks
- Two (2) 400 bbl water storage and disposal tanks
- One (1) 125 bbl water make-up tank
- One (1) 100 bbl amine make-up tank
- Six (6) drain tanks
- 480 V / 208 V /120 V 60 Hz single-phase electrical power from grid