Devon Energy – Normandville Pump Replacement

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the installation of a new booster pump at Devon Energy’s Normandville gas processing facility. This booster pump was required as the existing emulsion pump was causing a lot of vibrations to occur. The booster pump installation was one of numerous upgrades GLE completed at the Normandville gas processing facility. Project scope included the installation of:

  • One (1) Grundfos multi-stage vertical centrifugal pump rated at 83 US gpm @ 1750 rpm
  • Basket Strainer
  • Pump Bypass and Associated Piping

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy