Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the installation of a new booster pump at Devon Energy’s Normandville gas processing facility. This booster pump was required as the existing emulsion pump was causing a lot of vibrations to occur. The booster pump installation was one of numerous upgrades GLE completed at the Normandville gas processing facility. Project scope included the installation of:
- One (1) Grundfos multi-stage vertical centrifugal pump rated at 83 US gpm @ 1750 rpm
- Basket Strainer
- Pump Bypass and Associated Piping