CSV Midstream – Karr 6-18 Facility Expansions

Gas Liquids Engineering Ltd. (GLE) provided complete EPCM services for two brownfield expansions of a sour compressor and dehydrator near Grande Prairie, Alberta. The first expansion increased the throughput of the existing facility from 40 MMSCF/d to 80 MMSCF/d. The second expansion, which is currently underway will further increase the throughput of the facility to 150 MMSCF/d.

40 MMSCF/d to 80 MMSCF/d Expansion

The first expansion increased the throughput of the existing facility from 40 MMSCF/d to 80 MMSCF/d. The plant processes sour gas containing 0.5% H2S, and 8000 bbl/d of oil/condensate. The expansion required over 130 tie-ins throughout the plant. The schedule was extremely aggressive and the project was completed in 13 months from the date of the kick-off meeting to start-up. GLE’s scope of work included process, mechanical, civil, structural, and E&IC design work including PLC/HMI programming and on-site commissioning support. Numerous existing systems required modification in order to accommodate the expansion. Total project EPCM services were completed at a very low brownfield project cost of less than 10% TIC.

The project included the installation of:

  • Two (2) new 4730 hp compressor packages c/w Caterpillar G3616LE gas driven engines driving Ariel KBZ/6 3-stage compressors
  • New 18,000 bbl tank farm, designed with optional cascaded or bulk storage of oil/condensate and water
  • Two (2) new 36” 600 ANSI sour glycol dehydration packages
  • New 8’ x 30’ heater for a 2.6 MMBtu/h heat duty treater
  • New 750 kW natural gas driven generator, and synchronization to five existing generators
  • New 250 hp Electric Drive Ariel JG/2 Recycle Compressor
  • New 85 hp Electric Drive Rotary Vane Vapor Recovery Unit (VRU)
  • New instrument air package
  • New BTEX condenser tank
  • New MCC / Switch gear building
  • LACT unit modifications
  • Upgraded facility HMI
  • Piping, structural steel, piling, foundations, and earthworks
  • Full in-house EI&C Engineering

80 MMSCF/d to 150 MMSCF/d Expansion

The second expansion, known as “D2”, will further increased the throughput of the facility from 80 MMSCF/d to 150 MMSCF/d. “D2” also includes a major liquids processing expansion from 12,000 bbl/d to 30,000 bbl/d of oil/condensate, and 28,000 bbl/d produced water. The facility was completed and operational in July 2020. The project included the installation of:

  • One (1) 10’ I.D. x 50’ S/S Inlet Separator Package
  • Three (3) 10’ I.D. x 40’ S/S Treater Packages
  • Two (2) new 5000 hp main compressor packages c/w Caterpillar G3616 A4 gas driven engines driving Ariel KBZ/6 3-stage compressors
  • One (1) Gas Sweetening Unit (GSU)
  • One (1) Gas Chilling Unit (GCU) with De-Butanizer Unit
  • Two (2) Overhead Vapour Compressor Packages
  • Two (2) Sour Mixed Gas Compressor Packages
  • Two (2) Recycle Compressor Packages
  • New Flare System (Acid Gas (AG), HP, LP)
  • Two (2) 90,000 US Gallon Hydrocarbon Bullets c/w Two (2) Truck-out terminals
  • Two (2) 14,000 bbl Hydrocarbon Liquids (HCL) Storage Tanks c/w Eight (8) Truck-out terminals
  • Two (2) HCL Transfer Pumps
  • Two (2) 3000 bbl Treater Tanks
  • One (1) NGL LACT and Associated Pumps
  • One (1) 24 MMBtu/hr Heat Medium Package
  • One (1) Fuel Gas Package
  • One (1) Instrument Air Package
  • Two (2) 7.9 MW Siemens SGT300 Gas Turbine Gensets
  • One (1) Control / Office Building
  • Two (2) Electrical Utility Buildings
  • One (1) Warehouse
  • One (1) VRU Package c/w two (2) rotary vane compressors
  • One (1) NGL LACT c/w pumps + Three (3) HCL Recycle Pumps
  • Remote Electric Heat Tracing (EHT) Skids
  • Modular Pipe Racks with piping installed prior to shipment to site. Flanges were used to connect piping between modules.
  • Site grading and preparation, including berms, gravel foundations for tanks, and concrete foundations
  • Full in-house EPCM Services
  • Full in-house EI&C Engineering including DCS programming

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy