Gas Liquids Engineering Ltd. (GLE) provided complete EPCM services for the installation of an additional booster compressor upstream of an existing compressor located at the Freefight gas processing facility. Installed equipment included:
- One (1) Frick TDSH-355S Screw Compressor equipped with Caterpillar 3516 AFRC natural gas engine
- 6.5 MMSCF/d Capacity
- Allen Bradley CompactLogix Control Panel