City of Medicine Hat – 01-03-14-6 W4M Inlet Pigging

Gas Liquids Engineering Ltd. (GLE) provided complete EPCM services for the installation of new pigging equipment for the City of Medicine Hat at the Delta Compressor Station located at 01-03-14-6 W4M. The compressor station had three main pipelines feeding into the inlet separator (north, west, and east legs), and was replaced with a common inlet header with pigging capabilities. Project scope included:

  • Remove and dispose of the Delta metering shack
  • Remove and dispose of the Crowfoot metering shack
  • Remove and dispose of the underground tank in the west line
  • Relocate (2) above ground chemical tanks
  • Remove the current inlet header immediately upstream of the Delta metering shack, as well as design and prepare drawings for the replacement underground header
  • Design and prepare drawings for the new underground pipeline from the north side of the lease to the inlet separator building
  • Design and prepare drawings for common inlet header with pigging capabilities
  • Spec water pump, design and prepare drawings for water pump inside inlet separator building
  • Design and prepare drawings to move ESDV inside of separator building, improving dehydrator piping, general modifications to inlet separator piping
  • Update site P&ID’s / Metering schematics