Gas Liquids Engineering Ltd. (GLE) provided complete EPCM services for the installation of new pigging equipment for the City of Medicine Hat at the Delta Compressor Station located at 01-03-14-6 W4M. The compressor station had three main pipelines feeding into the inlet separator (north, west, and east legs), and was replaced with a common inlet header with pigging capabilities. Project scope included:
- Remove and dispose of the Delta metering shack
- Remove and dispose of the Crowfoot metering shack
- Remove and dispose of the underground tank in the west line
- Relocate (2) above ground chemical tanks
- Remove the current inlet header immediately upstream of the Delta metering shack, as well as design and prepare drawings for the replacement underground header
- Design and prepare drawings for the new underground pipeline from the north side of the lease to the inlet separator building
- Design and prepare drawings for common inlet header with pigging capabilities
- Spec water pump, design and prepare drawings for water pump inside inlet separator building
- Design and prepare drawings to move ESDV inside of separator building, improving dehydrator piping, general modifications to inlet separator piping
- Update site P&ID’s / Metering schematics