Gas Liquids Engineering Ltd. (GLE) completed the Pre-FEED and and the detailed design of Chevron’s Two Creeks Sour Oil Battery Expansion project, including the re-licensing of the facility for increased capacity, as well as full in-house EI&C engineering.

Chevron drilled new wells in the vicinity of the Two Creeks Oil Battery, which required modifications to the existing oil battery, as well as the installation of a 27 km 4” 900 Class pipeline from the oil battery to the Pembina Duvernay Gas Plant. Startup occurred in May 2020.

The following new equipment was installed:

  • Slug Catcher
  • Sweetening Inlet Separator
  • Battery Gas Compression Package – 3.3 MMSCF/d
  • Methanol Injection and Storage
  • Condensate Pump Package
  • Sour Tank Vent Scrubber
  • Water Degasser & Repurposing of Existing Inlet Separator
  • Combustor
  • Office Building
  • MCC / Instrument Air / Control Building
  • LED Lighting
  • 25 kVA 600 VAC Transformer
  • Tank Berm Modifications

The following existing equipment was removed:

  • One (1) 400 bbl Produced Water Tank
  • One (1) 1000 bbl Produced Water Tank
  • Four (4) 400 bbl Produced Hydrocarbon Tanks
  • Methanol Tank
  • Flash Drum & Building
  • Line Heater
  • H₂S Scavenger Tank
  • Existing Glycol Tracing System and Insulation

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy