Gas Liquids Engineering Ltd. (GLE) completed the Pre-FEED and and the detailed Plant Optimization design of Chevron’s Two Creeks Sour Oil Battery Expansion project, including the re-licensing of the facility for increased capacity, as well as full in-house EI&C engineering.
Chevron drilled new wells in the vicinity of the Two Creeks Oil Battery, which required modifications to the existing oil battery, as well as the installation of a 27 km 4” 900 Class pipeline from the oil battery to the Pembina Duvernay Gas Plant. Startup occurred in May 2020.
The following new equipment was installed:
- Slug Catcher
- Sweetening Inlet Separator
- Battery Gas Compression Package – 3.3 MMSCF/d
- Methanol Injection and Storage
- Condensate Pump Package
- Sour Tank Vent Scrubber
- Water Degasser & Repurposing of Existing Inlet Separator
- Combustor
- Office Building
- MCC / Instrument Air / Control Building
- LED Lighting
- 25 kVA 600 VAC Transformer
- Tank Berm Modifications
The following existing equipment was removed:
- One (1) 400 bbl Produced Water Tank
- One (1) 1000 bbl Produced Water Tank
- Four (4) 400 bbl Produced Hydrocarbon Tanks
- Methanol Tank
- Flash Drum & Building
- Line Heater
- H₂S Scavenger Tank
- Existing Glycol Tracing System and Insulation