Cenovus – 05-06-16-12-W4M MWB

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the construction of a new sour multi-well battery for Cenovus at their 05-06-16-12-W4M wellsite. Project scope included:

  • Three (3) Horizontal Wells & Tie-In’s
  • Inlet Group Separator (24” OD x 12’ Stainless Steel)
  • Inlet Test Separator (16” OD x 5’ Stainless Steel)
  • Ultrafab Sweetening Package
  • Three (3) 750 bbl storage tanks + Containment System
  • Two (2) Sirius Chemical Injection Skids
  • Fuel Gas Pipeline: 300 metres long, 2” FPLP Grade 301
  • Sales Gas Pipeline: 420 metres long, 3” FPLP Grade 301
  • Oil Emulsion Pipeline: 150 metres long, 3” FPLP Grade 601
  • Oil Emulsion Pipeline: 300 metres long, 3” FPLP Grade 601
  • Oil Emulsion Pipeline: 300 metres long, 4” FPLP Grade 601
  • Site Grading & Preparation
  • Solar Powered RTU and BMS Systems
  • Full In-House EI&C Engineering

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy