Athabasca Oil – 2019 Multi-Well Pads

Gas Liquids Engineering Ltd. (GLE) completed EPCM services for the detailed design of a greenfield quad oil pad for Athabasca Oil Corporation. The new pad site was designed to accommodate a six (6) well expansion on the pad. Startup date was March 2020. Initially installed equipment included:

  • Four (4) Wellheads
    • 2 MMSCF/d Gas Volume Each
    • 400 bbl/day Oil Volume Each
    • 400 bbl/day Water Volume Each
  • One (1) Quad Separator Package
  • One (1) Remote Terminal Unit (RTU) Panel
  • One (1) 1000 Gallon Methanol Tank
  • One (1) 1000 Gallon Paraffin Inhibitor Tank
  • One (1) 500 Gallon Corrosion Inhibitor Tank
  • One (1) Thermoelectric Generator (TEG)
  • One (1) 8” CL600 Low Pressure (LP) Pig Launcher
  • One (1) 6” CL600 High Pressure (HP) Pig Launcher
  • One (1) 3” CL600 Fuel Gas Pipeline
  • One (1) 4” CL1500 Lift Gas Pipeline

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy